Taipei Dome

< Back to list
Commence time
  • 02/2013
  • Finished time
  • 10/2011
  • Name of Projects
  • Taipei Dome
  • Scope of Works
  • Barrette Pile - W:120~150 (cm),L:260~700(cm) ; Depth: 55~73(m);
  • Bored pile - Diameter: 2.0~2.5(m); Depth: 58(m); Quantity: 128
  • Diaphragm wall - Diameter: T=120~150(cm); Depth: 36~47(m); Quantity: L=1,531(m)
  • Employer
  • Taiwan Obayashi Corporation ;Farglory Construction Co., Ltd.;Eastern Construction Engineering Co., Ltd.